| |||||||||||||||||||||||||||||
Bear Creek Bridge DemolitionContractor: Slayden Construction Group | |||||||||||||||||||||||||||||
McGee Engineering designed a temporary support system to support the Bear Creek Bridge on Interstate 5 near Curtin, Oregon during staged demolition. Portions of the existing bridge were removed to allow partial construction of a new bridge while maintaining interstate traffic flow. The temporary support system included steel posts to support each cap beam, overhang brackets to support the bridge deck, and a containment system to protect Bear Creek from demolition debris.
| |||||||||||||||||||||||||||||
McGee Engineering, Inc.P.O. Box 1067, Corvallis, OR 97339Phone: (541) 757-1270 Fax: (541) 758-6585 dennismcgee@mcgee-engineering.com Projects Staff Services Contact Us Last edited: 11/19/2010 | |||||||||||||||||||||||||||||