Civil Engineers Serving the Northwest
 

Salem Hospital Parking Garage Demolition

Contractor: Staton Companies

McGee Engineering designed a demolition plan in 2007 for the removal of a multistory parking garage at Salem Hospital in Salem, Oregon. The structure was a cast-in-place, post-tensioned concrete building with 7 stories. Although only 8 years old, the structure had to be demolished to make way for new buildings in the hospital complex. A key project parameter was to preserve the glass façade of the data center building that was adjacent to the parking garage. This required that the garage be separated from the data center as the initial step, which involved severing of the longitudinal post-tensioning system. Because the post-tensioning system was crippled, the building was shored throughout to control the demolition process. Seismic monitoring was installed to monitor ground vibration translation to the data center.


Section view of partially demolished building.
Click an image to enlarge.


McGee Engineering, Inc.
P.O. Box 1067, Corvallis, OR 97339
Phone: (541) 757-1270     Fax: (541) 758-6585
dennismcgee@mcgee-engineering.com


Projects Staff Services Contact Us
Last edited: 11/19/2010