Summers Creek

Owner: Weyerhaeuser Company

Contractor: Five Rivers Construction

McGee Engineering provided design services for an emergency bridge construction project near Kalama, Washington. During a large storm in January 2009 the existing road fill and culvert washed out, leaving a 120’ long hole in the road and the landowner with limited access for trucks and logging equipment. McGee Engineering designed a 139’ span, 26’ wide bridge to accommodate 2 lanes of off-highway truck traffic on a 1000’ radius curve and 3% super elevation. The bridge uses a driven pile foundation to support four precast, prestressed concrete girders with a cast-in-place concrete deck. The design was completed in early February, construction began in late February, and the bridge was opened to traffic in mid-May.


Completed bridge, looking from Town end approach.
 
Click an image to enlarge.


McGee Engineering, Inc.
P.O. Box 1067, Corvallis, OR 97339
Phone: (541) 757-1270     Fax: (541) 758-6585
dennismcgee@mcgee-engineering.com


Projects Staff Services Contact Us
Last edited: 11/19/2010